Construction of Bus Rapid Transit System Orange Line Infrastructure Development

Construction of Bus Rapid Transit System Orange Line Infrastructure Development

Construction of Bus Rapid Transit System Orange Line Infrastructure Development

Construction of Bus Rapid Transit System Orange Line Infrastructure Development

Transport and Mass Transit Department Government of Sindh

PRE-QUALIFICATION OF CONTRACTORS

Construction of Bus Rapid Transit System “ORANGE LINE” (Infrastructure Development)

Introduction

In pursuance of the special directives by the Honorable Chief Minister, Sindh, to alleviate the traffic problems of Karachi city, the Transport and Mass Transit Department (TMTD), Government of Sindh (GoS) invites applications for Pre-qualification of reputable and experienced local firms / consortia / or Joint Ventures for construction of Bus Rapid Transit System (“BRTS”)- ORANGE LINE (Infrastructure Development).

The Project

BRTS “ORANGE LINE ” is a 3.7 Km route (approx) starting from TMA Office Orangi Town to Board Office, Karachi.

Mass Transit Cell (MT Cell), TMTD wants to prequalify potential firms/consortia for the contract for infrastructure development of the ORANGE LINE BRTS Project. Pre-Qualified bidders will be issued detailed Request For Proposal (“RFP”).

The execution of the works is divided in two (02) packages which shall comprise of elevated and at-grade BRT corridor, at-grade road improvements, bus stations, bus depot and other associated works.

Prospective Bidders registered in PEC Constructor’s Category C-l or above (Specialization codes CE-01, CE-02 and CE-10) may apply for either or both packages provided they demonstrate the financial, equipment and human resources to carry out both packages simultaneously.

Package-I: From Town Municipal Administration (TMA) Orangi to Bacha Khan Flyover
Package II: From Bacha Khan Flyover to Board Office

Brief Scope of Work

The detailed scope of work to implement the project shall be provided at the bidding stage. However, briefly, firm(s) shall be expected to perform, among other things, following tasks:

a)    Construction of Bus Rapid Transit – Orange Line (Infrastructure Development) in accordance with design and specifications provided in the bid documents.

b)    Coordination with Utility Agencies and Contractors of other BRT Lines during Construction.

c)    Maintain and repair the Project in conformity with applicable standards during the envisaged maintenance period.

Pre-Qualification Documents

The Pre-qualification documents for submission may be collected from address given below against pay order / demand draft amounting to Rs.10,000/- (Non-Refundable) in favor of Project Director BRT Orange Line. Duly filled in Pre-Qualification documents must reach MTD office at the address given below by 2pm on 15th February, 2016. The Pre-qualification documents shall be opened on the same day at 3pm.

Contact for Queries and Submission of Pre-Qualification Document

Signature of Project Director, BRT Orange Line:

Fazal Karim Khatri

Director, Planning & Coordination, Mass Transit Cell,
Transport and Mass Transit Department, GoS
6th Floor, East Annexe, Civic Centre, Gulshan-e-lqbal, Karachi, Pakistan.
Tel: 021-99231280, Email: fkkhatrl@gmall.com

Reply